📊 Basic Information
Model NO.
Sandblasting Machine
Application
Steel Plate Pre-Treatment
Cleanliness
High Cleanliness
Cleaning Method
High-Pressure Washer
Core Selling Point
Easy to Operate
Advantages
High Performance
Production Capacity
30 pieces/Month
🛠️ Product Description
Main Components
⚙️Blast chamber: Frame of the room, steel plates or rock wool panels, protective lining.
⚙️Recovery system: Hoppers, grids, screw conveyors, bucket elevators, and separators.
⚙️Dust removal system: Dust collectors, pipes, ventilation fans, and chimneys.
⚙️Transportation mechanism: Battery carts or cart systems driven by reduction gear.
⚙️Lighting system: LED lights with heavy-duty protective glass.
⚙️Operator trolley: 2D or 3D operator trolley options.
⚙️Electrical control system: PLC control cabinet, sensors, and high-quality cables.
Characteristics
- Simple structure with few maintenance points.
- Low procurement cost, suitable for small volume blasting work.
- Saves abrasives; no need for large amounts to run the system.
- Multiple layouts available, fully customizable.
⚠️ Operating Precautions
To ensure safe and efficient operation, operators must wear protective clothing and helmets with fresh air supply. Conduct a daily pre-start inspection of all attachments, door seals, and blasting guns. Only authorized personnel should be in the blasting area. Workpiece handling must be done slowly to ensure safety on railways and unobstructed doors.
📋 Product Parameters
| Brand | SirDa |
| Usage | Polishing, cleaning surface |
| Cleaning process | Steel shot/gravel |
| Material | Metal/coils |
| OEM | Yes |
| After-sales service | Online support |
| Voltage | Customer's country voltage |
🚀 Product Application
Blast rooms are widely used in various industrial processes:
✅Metal processing: Removing rust and scale to improve corrosion resistance.
✅Automotive industry: Pre-treatment for buses, removing old paint and improving surface roughness.
✅Heavy Industries: Essential for aerospace, shipbuilding, and petrochemical sectors.
🏢 Production & Quality
❓ Frequently Asked Questions
How many days are required to produce this machine?
Standard machines are in stock for immediate delivery. Customized machines typically require 30 to 50 days from engineering design to completion.
How does your factory handle quality control?
We prioritize quality control from start to finish. Each machine is fully assembled and carefully tested before shipment to ensure perfect operation.
What is the machine quality guarantee?
We provide a one-year quality guarantee. We use world-famous brand components to ensure the machine remains in perfect working condition.
Do you provide overseas installation and commissioning?
Yes, we provide overseas services. We can send 1-2 technicians to assist with installation, commissioning, and training. Small machines take about 5 days, while larger systems may take 20-60 days.
What documents are provided with the machine?
We provide full English documentation, including foundation drawings, manuals, electric wiring diagrams, and maintenance books.
How can I trust the delivery of the correct machine?
We deliver high-quality machines as confirmed in the order. Our culture is built on innovation, quality, and integrity. Sirda is a recognized supplier with a strong reputation for customer satisfaction.